At niogod™, we are dedicated to pushing the boundaries of high-performance computing and intelligent systems. We prioritize efficiency, mapless AI logic, and robust infrastructure. We are looking for a developer who thrives at the intersection of low-level systems programming and scalable AI deployment.
In this role, you’ll:
- ▶Engineered Performance: Develop and optimize C++ code for real-time data processing, neural network inference, and advanced visualization.
- ▶HPC Management: Architect and administer HPC clusters tailored for deep learning workloads, utilizing Slurm, Ceph, and high-throughput storage.
- ▶System Sovereignty: Manage a diverse stack of application servers including Forgejo, Nextcloud, OpenProject, and mission-critical ERP/Mail/SIP services.
- ▶Infrastructure as Code: Automate workstation provisioning and server configuration using Ansible to maintain a seamless development environment.
What we require:
- ✓Systems Mastery: Deep knowledge of Linux kernel internals or low-level hardware programming.
- ✓Modern Toolchain: Proficiency in C++, with additional experience in CUDA, Python, or Rust.
- ✓Embedded & UI: Hands-on experience with embedded development and the Qt framework for high-performance interfaces.
- ✓Full-Stack Awareness: Basic web development experience to support and integrate internal service dashboards.
It’s a plus if you have:
- Advanced experience in GPU acceleration (CUDA) or memory-safe systems programming (Rust).
- Experience contributing to open-source Linux projects or custom kernel modules.
What we offer:
- 🚀 Cutting-Edge Tech: The opportunity to build and break things using state-of-the-art AI.
- ⚡ No Red Tape: A flat hierarchy with a total focus on technical excellence.
- 🕰️ Flexibility: Results-oriented work culture with flexible hours.
- 💰 Competitive Compensation: A salary that reflects your expertise.
Join the Mission
If you believe in building lean, powerful, and intelligent systems without the overhead of traditional corporate structures, we want to hear from you.
Apply Now