// Robotics · Series B · Munich

Perception stack acceleration.

14-engineer pod · 8 months · TRL 6→7 · ROS2 / NVIDIA Isaac. Senior Consultant from autonomous-systems vertical; Werkvertrag scope: perception module integration with downstream control. No onsite Einsatz; Projektleiter executed all in-jurisdiction interactions.

// AI/ML · Series A · Berlin

Enterprise LLM platform.

9-engineer pod · 6 months · vLLM / RAG production. Werkvertrag scope: production-grade RAG pipeline, vector index, eval harness. AVV under Art. 28 DSGVO; AWS Frankfurt processing region.

// SAP · Series C · Stuttgart

S/4HANA migration programme.

3-pod programme · 12 months · BTP / CAP integration. Programme-level Projektleiter; one Senior Consultant per ABAP, BTP, and Fiori track. Quarterly steering with Geschäftsführung. Full Werkvertrag posture maintained.

// Industrial · Series A · Karlsruhe

OPC-UA / MES bridge.

5-engineer pod · 9 months · OPC-UA / MES / edge orchestration. Senior Consultant from Industry 4.0 vertical; integration of legacy SCADA into greenfield MES. Documented monthly Aufwandsbericht.

// Medtech · Series B · Vienna

IEC 62304 audit-ready stack.

7-engineer pod · 10 months · IEC 62304 / ISO 13485-aligned DevOps. Senior Consultant carried prior MDR-grade experience. Full traceability matrix delivered alongside the Werk; submission-ready artefacts.

// Defense · Series A · Aachen

Sensor fusion stack (anonymized).

4-engineer pod · 6 months · sensor fusion / edge inference. Dual-use export awareness encoded in scope. Strict no-onsite posture; all interactions through the Stuttgart Projektleiter.

Engagement details, named Mandanten, and quantified outcomes disclosed under NDA upon request. niogod™ does not publish unauthorized client logos or fabricated quotes.

For sector-specific engagement references and a sample Statement of Work:

Request engagement references →